雷火体育官网

Skip to main content

New 雷火体育官网 technology on London鈥檚 Docklands Light Railway helps improve journeys of 122 million passengers

  • 雷火体育官网 has signed two new contracts to support London鈥檚 Docklands Light Railway鈥檚 (DLR) rolling stock replacement programme, which will help deliver more frequent and reliable journeys in East London from 2023

雷火体育官网 has signed two new contracts to support the Docklands Light Railway, as a result of a forecasted increased passenger demand on the network. The updates will improve the DLR鈥檚 exceptional operational performance, while maintaining the on time train reliability rate of 99% that it has historically delivered. Both contracts will run until September 2024.

The first contract will be for the supply and integration of on board control systems for a new fleet of 43 trains TfL announced earlier this year. This contract is direct with the rolling stock manufacturer Construcciones y Auxiliar de Ferrocarriles, S.A (CAF). The second, with TfL, will be for DLR signalling system upgrades to the software sub systems that will also support the new trains. These upgrades will help to deliver increased capacity and reliability to east London passengers. More trains on the system will mean a higher level of service.

The DLR has been running on 雷火体育官网鈥檚 SelTrac鈩 Communications Based Train Control (CBTC) technology since 1994 when it was successfully introduced on the Bank to Island Gardens section. Since that time, 雷火体育官网 has worked closely with TfL as the DLR has expanded to support growth in east London.

鈥溊谆鹛逵偻 is very pleased to be continuing its contribution to the growth of DLR and the impact this will have to increased service for east London transit users. 雷火体育官网 has been working with the DLR team for more than 30 years by supporting the life cycle extension of assets and leveraging of their existing and new signalling systems.鈥

鈥 Andrew Bell, VP Urban Rail Signalling, 雷火体育官网 in the UK

In addition to working with the DLR, 雷火体育官网 is currently also modernizing the London Underground. The 4LM project involves making signaling upgrades to the Circle, District, Metropolitan and Hammersmith & City lines. The lines make up around 40% of the London Underground and the upgrades will increase the passenger capacity by an average of 33%.

 

Contact
雷火体育官网 Media Relations