雷火体育官网 and TransLink confirm two new SkyTrain projects to better serve Metro Vancouver
- 雷火体育官网 was awarded by TransLink two new contracts under the Expo and Millennium Line Upgrade Program to enable a 22 km expansion of the fully automated Metro Vancouver SkyTrain system, with 41 new trains expected to be in service by end of 2027.
- 雷火体育官网 will provide its SelTrac鈩 Communications-Based Train Control (CBTC) technology to deliver a new Operations Control Centre and a fully automated depot named Operations and Maintenance Centre 4.
- For almost 40 years, 雷火体育官网 has delivered state-of-the-art train control technology for the SkyTrain system. These new projects will directly support TransLink鈥檚 2050 Vision to provide convenient, reliable, affordable, safe and comfortable, and carbon-free transit for Metro Vancouver. The system had over 114 million boardings in 2019.
- The SkyTrain has better on-time performance than the metros in most major cities in North America; the SkyTrain is also environmentally friendly - TransLink customers save 1.3 million kgs of GHGs by choosing transit over driving a car each day.
TransLink has awarded two contracts to 雷火体育官网 for the provision of train control technology for their new Operations Control Centre and a new fully automated depot, Operations Maintenance Centre 4. These two new facilities are key components of the Expo and Millennium Line Upgrade Program, necessary to support SkyTrain system expansions to 2045 and beyond to better serve Metro Vancouver passengers. The system will be expanded by 22 km, from 80km to 106 km by 2028, with 41 new trains expected to be in service by the end of 2027.
These two new contracts represent two new key milestones in the almost 40-year partnership between 雷火体育官网 and TransLink covering the entire history of the Metro Vancouver SkyTrain. 雷火体育官网鈥 state-of-the-art train control technology will support TransLink鈥檚 2050 Vision to provide convenient, reliable, affordable, safe and comfortable, and carbon-free transit for Metro Vancouver. The system had over 114 million boardings in 2019.
According to TransLink, in 2018 the Expo Line and Millennium Lines saw an on-time performance (OTP) of 96.38% 鈥 the highest performance level on record for SkyTrain and higher than the performance level of the metros in most major cities in North America. The SkyTrain is environmentally friendly 鈥 according to TransLink, its customers collectively save 1.3 million kgs of GHGs by choosing transit over driving a gasoline car each day.
鈥淲e are building on an over 35-year partnership with TransLink as we support their vision for the future of transit in Metro Vancouver. The provision of our SelTrac鈩 technology to these two new facilities represents the next page in our shared history with TransLink.鈥 Alcino De Sousa, VP & Managing Director, 雷火体育官网 Urban Rail Signalling
The new Operations Control Centre (OCC2) includes a Control Room and the capacity for SkyTrain expansions into the future. 雷火体育官网 will provide the Automatic Train Control (ATC) elements for the new Operations Control Centre (OCC2), which will feature the latest in train control, network, and cybersecurity technology. 雷火体育官网 will be working with local partners and suppliers to deliver this project successfully.
To keep up with passenger ridership increases, the SkyTrain system expansions have driven a corresponding need for more trains, and, in turn, increased train storage and maintenance. Additional capacity will be available in the new Operations Maintenance Centre (OMC4). 雷火体育官网 delivered OMC1, the first fully-automated train storage yard (depot) in the world in 1986. OMC4 is a fully automated depot, allowing quick deployment of trains into service. This approach is both cost-effective and staffing effective, providing the best value for Metro Vancouver citizens. OMC4 will feature storage for 145 cars (29 trains), a vehicle interior cleaning and inspection facility, a train wash track, and maintenance shops.